The 2026 programme is designed to test three initial scout drill targets, distributed along the Ilua Pegmatite Zone, a prospective, conventional REE-hosting system, extending for at least 5km of strike. Drilling will be supported by detailed geological mapping, channel sampling, and mineralogical studies aimed at further defining the geometry, continuity, and rare earth mineralogy of the system. The analysis will also start to define the economic potential and best commercialisation options.







