See: Woodfibre LNG says new module delivery brings project to 65% complete




Woodfibre LNG says its export facility under construction is now about two-thirds complete after the arrival of another major prefabricated unit. The company said the latest shipment—the project’s powerhouse module—reached the site by ship on March 17.



Source link

  • Related Posts

    Illinois results solidify JB Pritzker’s ‘powerhouse’ role — and set up a White House run

    Carol Moseley Braun — the former U.S. senator from Illinois and first Black woman to hold the office — had just ended a call with newly minted Democratic Senate nominee…

    Asian shares skid as oil tops $111 a barrel and Wall Street slumps

    BANGKOK (AP) — Shares retreated Thursday in Asia after stocks on Wall Street slumped as oil prices spiked at more than $110 a barrel. U.S. stocks also sagged due to…

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    You Missed

    Today’s NYT Mini Crossword Answers for March 19

    Today’s NYT Mini Crossword Answers for March 19

    Delta Air Lines’ Boeing 717s To Allegedly Go Months Without WiFi Due To System Switch

    Delta Air Lines’ Boeing 717s To Allegedly Go Months Without WiFi Due To System Switch

    Illinois results solidify JB Pritzker’s ‘powerhouse’ role — and set up a White House run

    Illinois results solidify JB Pritzker’s ‘powerhouse’ role — and set up a White House run

    March Madness bracket: Miami (Ohio) shuts down doubters with First Four win over SMU

    March Madness bracket: Miami (Ohio) shuts down doubters with First Four win over SMU

    PUBG: Battlegrounds Turns 9 – 3 Reasons Why Now is the Best Time to Drop In

    PUBG: Battlegrounds Turns 9 – 3 Reasons Why Now is the Best Time to Drop In

    Derby Sneakers Are the Shoes Every Fashion Person Will Wear in 2026

    Derby Sneakers Are the Shoes Every Fashion Person Will Wear in 2026