South Bow plan to revive parts of Keystone XL needs Trump approval, U.S. oil pipeline links


Text to Speech Icon

Listen to this article

Estimated 5 minutes

The audio version of this article is generated by AI-based technology. Mispronunciations can occur. We are working with our partners to continually review and improve the results.

A proposal led by Canadian company South Bow to revive parts of the cancelled Keystone XL oil pipeline could increase Canada’s crude exports to the U.S. by more than 12 per cent, if it gets a green light from U.S. President Donald Trump and additional links to U.S. refining hubs are built.

The new proposal involves a different route through the U.S. than the previous Keystone XL pipeline project cancelled by former U.S. President Joe Biden in 2021, after years of Indigenous and environmental opposition.

South Bow, which was set up by former Keystone XL proponent TC Energy in 2024 to take over its oil pipeline business, is considering reviving some of the line that was already built in Alberta and already has all necessary Canadian permits.

Canadian Prime Minister Mark Carney brought up the pipeline’s revival in a conversation with Trump in October, and it could provide him leverage in upcoming negotiations around renewing the Canada-U.S.-Mexico (CUSMA) trade agreement.

Trump — whose tariff wars and annexation threats have strained relations with Canada — has repeatedly called for lower oil prices, and many U.S. refiners depend on the roughly 4.4 million barrels per day of exports that Canada sends south of the border.

South Bow’s potential U.S. partner, Bridger Pipeline, recently filed a proposal with Montana regulators that describes the construction of a 1,038-kilometre pipeline — capable of transporting up to 550,000 barrels per day — beginning near the U.S.-Canada border in Phillips County, Montana, and transiting to Guernsey, Wyoming.

But analysts say Guernsey is not an end market for crude oil, so additional links would need to be built to transport oil to refining hubs such as Cushing, Oklahoma; Patoka, Illinois; and the U.S. Gulf Coast.

WATCH | Talks of Keystone XL pipeline revival met with cautious optimism:

Talks of Keystone XL pipeline revival met with cautious optimism

Prime Minister Mark Carney raised the Keystone XL pipeline project during conversations with U.S. President Donald Trump on Tuesday, according to a source CBC News is not identifying because they were not authorized to speak publicly. The news has proponents wondering whether the more-than-once cancelled project could be revived again.

The most credible configuration would be a new pipeline spanning more than 680 kilometres from Guernsey to Steele City, Nebraska, where it could connect to the existing Keystone mainline system, said Matthew Lewis, founder of Plainview Energy Analytics. From there, the oil could move into underutilized pipelines running toward Cushing, Patoka and Wood River, Illinois.

It remains unclear, however, who would be willing to take on the risk associated with that leg of a project.

“The biggest challenge in this plan in a Guernsey-to-Steele City segment is gaining permits, and building new pipeline that would likely face environmental litigation tying up such a project up in court,” Lewis said.

South Bow said its proposal could connect to downstream pipelines in the U.S.. but declined to comment further. Bridger Pipeline declined to comment.

Leveraging existing infrastructure

Bridger is proposing to build the Montana-to-Guernsey leg in locations alongside existing pipeline infrastructure, its application states, which would likely make getting required permits easier. On the Alberta side, approximately 150 kilometres of Keystone XL pipe is already built and has been sitting idle since that project was cancelled.

A White House spokesperson declined to comment on the South Bow-Bridger proposal, but analysts said a presidential permit would be required for the segment that crosses the U.S.-Canada border. Even if the Trump administration supports the plan, there is no guarantee that the next U.S. administration would, said Richard Masson, former CEO of the Alberta Petroleum Marketing Commission.

Pipe ready to be used for the construction of the Canadian leg of the Keystone XL in Alberta near the town of Oyen, in September, 2020. (Kyle Bakx/CBC)

While the proposal may be different than Keystone XL, it remains a large-scale pipeline expansion and will likely attract the ire of environmentalists, landowners and Indigenous communities, Masson said.

Many pipeline projects in the U.S. have been cancelled or bogged down in litigation. Trump and his team have tried to cut regulation and speed permits, but a multi-year project across more than one administration would carry political risk.

“It brings up all the same issues. For those who wanted Keystone XL cancelled, this is all the same stuff,” Masson said.

Competing export pipeline expansions

The proposed project comes at the same time that the company behind the Trans Mountain pipeline from Alberta to Canada’s west coast is planning a series of enhancements that could increase its capacity by 360,000 bpd.

South Bow’s competitor, Enbridge, has already approved expansion projects for its Flanagan and Mainline pipeline systems, which will add a combined 250,000 bpd of capacity for Canadian heavy oil shippers moving crude to the U.S. Midwest and Gulf Coast.

Those projects are less complicated than South Bow’s proposal and will be more economic, said TD Securities analyst Aaron MacNeil.

He said South Bow will face questions from investors about its ability to finance a new pipeline project while maintaining its dividend and avoiding taking on too much debt.



Source link

  • Related Posts

    Poilievre would share critical minerals with allies without tariffs

    Speaking at an event in London, U.K., organized by CANZUK, an advocacy group pushing for closer ties between Canada, Australia, New Zealand and the United Kingdom, the Conservative leader reiterated…

    Ring of Fire roads to be complete by 2031, ahead of schedule: Ford

    Construction on the roads to the Ring of Fire in northern Ontario should start this year and be completed by 2031, the province announced Monday about a project that has…

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    You Missed

    Iran-U.S. war chokes key shipping lane and threatens global cargo industry

    Iran-U.S. war chokes key shipping lane and threatens global cargo industry

    Clueless cops post seized crypto wallet password. $5M quickly stolen.

    Clueless cops post seized crypto wallet password. $5M quickly stolen.

    Mark Stoops joins Texas coaching staff as special assistant to Steve Sarkisian

    Mark Stoops joins Texas coaching staff as special assistant to Steve Sarkisian

    The original Cities: Skylines is getting a new Race Day expansion next week, as Paradox parade the fact the series is turning 11

    The original Cities: Skylines is getting a new Race Day expansion next week, as Paradox parade the fact the series is turning 11

    What dangers does the Iran war pose for Israel? | Conflict News

    What dangers does the Iran war pose for Israel? | Conflict News

    Alberta’s premier says conflict in Iran underscores need for new Canadian pipeline

    Alberta’s premier says conflict in Iran underscores need for new Canadian pipeline